PLAN REVIEW SHEET Date )4/i Kl 17
Plan Box# I-e_ Job Name crAvd (Gr'q, I I LH/1/4C
Plan Name , ,�
App # 1-]Soo�l25 g� Valuation_on� SQ Feet n�f
Garage /7J�`w
Inspections for SFD/SFA
Crawl_ Slab_ Mono_ Basement_
footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
rI Final
Foundation Survey�� Envir. Health ___ Sr Other
Additions/ Other ✓ a x U JVICI°
Footing_
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final •