PLAN REVIEW SHEET Date
Plan Box # 1 t o Job Name,_ 4M
Plan Name 7 E 4-
App #
App # y1c%IS Valuation 30228)
a�L�-9`�-' SQ Feet_24%___1/3
Garage 4V7
Inspect ions forSFD/SFA
Crawl Slab
Mono_ Basement_
Footing Footing Plum Under Slab
FoundationFooting
Foundation Ele. Under Slab
Address Foundation
Address Address
Open Floor Slab Waterproofing
Rough In Rough In Mono Slab Plum Under slab
Rough In Address
Insulation Insulation
Final Insulation Slab
Final Final
Open Floor
Rough In
Insulation
/ Final
Foundation Survey_ Envir. Health V
Other
Additions / Other
Footing___
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final