PLAN REVIEW SHEET (2) Date IC) I it , 11
Plan Box it C_Lc Job Name 9tf\C 1
Plan Name curat.tt.
App it 1 Q J2 Co Valuation ' 4: fNv SQ Feet 13/f
Garage IV Coep
_ /q/S
Inspections for SID/SFA
Crawl ✓ Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey_ Envir. Health Other
Additions/ Other
Footing_
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final