PLAN REVIEW SHEET Date •
• _.
Plan Box#______' ` Job Name e• � i. a
App # �� �� Valuation-4SQ Feet
_� Garage ti
/ y
inspections for SFD/SFA
v/
Crawl Slab_ Mono_ Basement_
Footing Footing
Plum Under Slab Footing
Foundation Foundation
Ele. Under Slab Foundation
Address Address Waterproofing
Address Open Floor Slab Mono Slab Plum Under slab
Rough In
Rough In Rough In Address
Slab
Insulation Insulation Insulation
Final Final Open Floor
Final Rough In
Insulation
Final
Foundation Survey
A f Envir. Health --
Other_=�
Additions / Other
Footing_
Foundation_
Slab
Mono_
Open Floor_
Rough In_
insulation
Final_