PLAN REVIEW SHEET Date q /2o/ii
Plan Box U Ail 1 Job Name 24SQYV2 # Kit
Plan Name 1W Outland.
App# 11490IbtUbli4
Valuation 4eto, 78'7 SQ Feet 2c27g
Garage 58/
Inspections for SFD/SFA
Crawl /Slab Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation He. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey k‘j-QS Envir. Health ILW Other
Additions/Other
Footing_
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final