PLAN REVIEW SHEET Date q l [ Cl / I 0
Plan Box # g 1 I. CI J i 17 Job Name LM:� l-+
Plan Name
Apply LLa3 I Valuation/1;111# Se Feet 2(pn�i
Garage c137
= .301-1v
Inspections for SFD/SFA
Crawl_ Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
/ Final
Foundation Survey✓ Envir. Health Other
Additions/ Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_