PLAN REVIEW SHEET Date G ` 1GI1 --7
Plan Box# 1.)k-01.)k-0Job Name wH
-
App It tu aa9s valuation4(-1t� SQ Feet oMS
Garage 395-
a1ND
Inspections for SFD/SFA
Crawl_ Slab_ Mono Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
/ Final
Foundation Surve Envir. Health `� Other
Additions/ Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_