PLAN REVIEW SHEET Date 6i10 I I
Plan Box# tJS Job Name <) OR S-\ t-1,--Fer'k
App # i4).3- 54-1 Valuation/423;V/ SQ Feet )121
Garage
Inspections for SFD/SFA
Crawl Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab • Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
\ V
Foundation Survey Envir. Health h'_I (6.\--
Other
Additions / OtherU V6t 4 t I X r lg g' I 1 c \,� \
Footing D J✓n
FoundationJ'-/ `
_ 00W'
Slab_
Mono_
Open Floor__
Rough In
Insulation_
Final_