Loading...
BUILDING Plan Box Number J • Name c i b Date: +p11 \ 4 Required Inspections for SFA/SFD Appl. # 1 L— CM? ¶t7b Valuationcar Z o Y 67C Sq. Feet 3 ) Y) Sequence 10 R* Bldg. Footing 10 -30 R* Elec. Temp Service Pole 20 R* Building Foundation 20 Address Confirmation 30 -999 Open Floor 30 -999 ✓ R* Bldg. Slab Insp. r'Levap 30 -999 R* Elec. Under Slab 30 -999 ✓ R *Plumb. Under Slab 40 f Four Trade Rough In 40 Four Trade Rough In> 2500 40 Three Trade Rough In 40 Three Trade Rough In> 2500 40 Two Trade Rough In 40 Two Trade Rough In> 2500 40 One Trade Rough In 40 One Trade Rough In > 2500 50 ✓ R* Insulation 60 ✓ Four Trade Final 60 Four Trade Final > 2500 60 Three Trade Final 60 Three Trade Final > 2500 60 Two Trade Final 60 Two Trade Final > 2500 60 One Trade Final 60 One Trade Final > 2500 999 Envir. Operations Permit