PLAN REVIEW SHEET Date 9/11/I1
Plan Ban t....--.1 Job Name S U.4tra t( IrSt
Plan Name tAl. riAticajaa
4 [ 634
App RI Valuation) l SQ Feet 7.5
Garage
= Ain
Inspections for SFD/SFA
Crawl_ Slab V/ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address
Waterproofing
Open Floor Slab
Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey Envir. Health r\• eW Other
Additions / Other
Footing_
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final