PLAN REVIEW SHEET r1 Date 1 "'7
Plan Box lain_ Job Name r
App g--I1 j Valuations S / SQ Feet
Garage 1007
_ •�S it
Inspections for SFDSFA
Crawl_ Slab ✓ Mono_
Basement_
Footing Footing Plum Under Slab
oting
Foundation Founds
Foundation Ele. Under Slab
Address Foundation
Address Address
Open Floor Slab Waterproofing
Rough In Mono Slab Plum Under slab
Rough In Rough In Address
Insulation Insulation
Final Insulation Slab
Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey Envir. Health
Other,_
Addition/Other
Footing__
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final