PLAN REVIEW SHEET Date C i / ) rl
Plan Box# "r Job Name '( Q hr1 LC
App# IU qDco Valuation 4/tiP,bllo SQ Feet /erg
Garage tia.2
Inspections/for SFD/SFA
Crawl `� Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation He. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor '
Rough In
Insulation
1/e/
/ Final
Foundation Survey_ Envir. Health" Other
Additions /Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_