Loading...
PLAN REVIEW SHEET • • Date (-1 • lo H Plan Box il ALIt Job Name LILai (. O. Ut3i .i' Abp# 41 fm?,r) Valuation 3 bl 22 Heated SQ Feet Garage 3t Inspections for SFD/SFA Crawl_ Slab_ Mono Basement Footing Footing Plum Under Slab Footing Foundation Foundation. Ele. Under Slab Foundation Adlress Address Address Waterproofing Open Floor Slab Mono Slab Plum Under slab Roagh In Rough In Rough In Address Insolation Insulation Insulation Slab Find Final Final Open Floor. Rough In Insulation • Final Foundation Survey_ Envir.Health_ Other Additions/Other 12lQ Fooling Foundation _ �) I? qa Slab_ Mono_ Open Floor_ Rough in Insulation Final_