Loading...
BUILDING Plan Box Number ` Job Name AA1C //0 Date: !a 2-T-73 Required Inspections for SFA/SFD Appl. # O °?5702 1 Valuation DEW Sequence Sq. Feet 17,37 10 li R* Bldg. Footing 10 -30 ,r R* Elec. Temp Service Pole 20 . - R• Building Foundation 20 - Address Confirmation 30 -999 Open Floor 30 -999 30 -999 tcl rr ..,� 30 -999 R"Iumb.- Under:Slab 40 Four Trade Rough In 40 Four Trade Rough In> 2500 Three Trade Rough In Three Trade Rough In> 2500 40 Two Trade Rough In 40 Two Trade Rough In> 2500 One Trade Rough In One Trade Rough In > 2500 50 z- R• Insulation 60 c Four Trade Final 60 Four Trade Final > 2500 60 Three Trade Final 60 Three Trade Final > 2500 60 Two Trade Final 60 Two Trade Final > 2500 60 One Trade Final 60 One Trade Final > 2500 999 Envir. Operations Permit