PLAN REVIEW SHEET Date g31 1 / J 7
Plan Box# -611( Job Name LrAlen Cts COSI-04
App # Valuation4I41SQ Feet et/ /‘..2‘847S
Garage L/4r7
_
Inspections for SFD/SFA V
Crawl_ Slab_ Mono_ Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab • Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
^ I Final
Foundation Survey I Envir. Health Other
V
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final