PLAN REVIEW SHEET Plan Box p Date t I a
Job Name / C1
APR# *L `- O Valuation't-T `[�/ SQ Feet a/
Garage 3/0 7
.2519
Inspections for SF FA for SFF FA
Crawl_ Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation He. Under Slab
Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab
Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation
Final Final Slabp
Final Open Floor
Rough In
Insulation
/ Final
Foundation Survey✓ Envir. Health v Other
Additions/Other
Footing_
Foundation_
Slab_
Mono_
Open Floor
Rough In
Insulation_
Final