PLAN REVIEW SHEET AA Date $(I1/ 17
Plan Box ft AA4 Job Name Bi•wt tiCl S$3
Plan Name 1/1/41. GIVIV.JS& 7ff
App ri I��SUDy1A$�I valuation 'l I LI g EC SQ Feet 11 9G,
Garage S C
= l '7 7 ?
Inspections for SFD/SFA
Crawl Y Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
11
' n I Final
Foundation Survey 'I1S Envir. Health kW Other
Additions/ Other
Footing_
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final