PLAN REVIEW SHEET 11 II Date C6 I i fl
Plan Box# L` f Job Name r
App# 4 ( 1� Valuation �t 193C SG Feet 1^79} I
Garage 6 39
= 0213 0
Inspections/for SFD/SFA
Crawl \/ Slab__ Mono___ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab
Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab
Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation
Final Final Slab
Final Open Floor
Rough In
Insulation
Final
Foundation Survey_ Envir. Health_ Other
Additions Other
Footing_
Foundation_
Slab_
Mono_
Open Floor,__
Rough In
Insulation_
Final