PLAN REVIEW SHEET Date I
Ran Box# 1/4.41-(1_ Job Name (-Limjo f..n )..
App e Li ICI )( Valuation lW`F C -I Heated SQ Feet / gti"7
Garage & 2 1/
Inspections for SFD/SFA /
Crawl_ Slab/ Mono_ Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation. - Ele. Under Slab Foundation
Address Address: Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Stab
Final Final - Final Open Floor.
Rough In
Insulation
Final
Foundation Survey= Envlr.Health V r,U L Other.
Additions/Other
Footing
Foundation_
Slab
Mora_
Open Floor
Rough In
Insulation_
Final_