PLAN REVIEW SHEET Date P-1 I -1�/
Watt Box d Dc-. ) C,Job Name �I NY /7491
App A u I (r04 Valuation -2 219 Q -( Heated SQ feet_a412-(
Garage H 7
= zg
inspections forSFD/SFA
Crawl_ Slab V Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Fie. Under Slab Foundation
Adtress Address_ Address Waterproofing
Open Floor Slab Mono Slab Flinn Under dab
Rough In Rough In Rough In Address
Insolation Insulation Insulation Slab
Final Final - Final Open floor.
Rough In
Insulation
Final
Foundation Survey=— Envir.Health Of vIl Other
Additions/Other
Footing
Foundation_
Slab__
Mono_
Open Floor
Rough In
Insulation_
Final_