PLAN REVIEW SHEET Date 7/ r7/ /7
Plan Box# �,{ Job Name l a.ce c
App # y � Valuation 19 I '7 1 2 SQ Feet 199'1
Garage '} 17
= 2q I41
IIs ections for SFD/SFA
Crawl_ Slab_ Mono Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab
Address Foundation
Address Address Waterproofing roofing
Open Floor Slab Mono Slab
Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation
Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey /Envir. Health Other
Additions/Other
Footing___
Foundation_
Slab_
Mono_
Open Floor_
Rough In__
Insulation_
Final