PLAN REVIEW SHEET APIA Date /' 1aJir)
Plan Box p Job Name ! y
App# � u • Valuation
i9
Lk') 2 2g*8) SQ Feet -26 C 3
Garage L12 y(
= VIZ?
Inspections for SFD/SFA
Crawl_ Slab_ Mono ‘ �'.. Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation
Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey Envir. Health_ Other
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor
Rough In
insulation_
Final