PLAN REVIEW SHEET pQ Date 7--(.l-1 1
Plan Box # J Job Name fret'h<M cusw.4 t thous'
APP # Hies < ValuationsaO37I2_ SQ Feet 122
Garage 1/22
= .2X 1 �I
Inspections for SFD/SFA /
Crawl_ Slab✓ Mono_ Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab • Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey CitS Envir. Health_____ Other
Additions/ Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final