PLAN REVIEW SHEET Date 1-1S-1 1
Plan Box# \ .\ .E. ��j,JobName Mwst2all cialit✓tS�l
App # l,nS l Valuation / y 5 M SCI Feet t -c-so
Garage 4 8 t
=20gt
Inspections for SFD/SFA
Crawl / Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab • Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
C
Foundation Survey�� Envir. HealthS t Jtar Other
Additions / Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_