PLAN REVIEW SHEET Date l4 / cp fl ) J '1
Plan Box U k-- s Job Name I . Ir. / 1
APP g 41 L 1G l Valuation` 0119 r?S. SQ Feet aV ar,
Garage gft(c
= a&31 .
InspectIons for SED/SEA
Crawl / Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation fie. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey `/ Envir. Hearth Other
Additions/Other
Footing
Foundation__
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final