Loading...
PLAN REVIEW SHEET Date (-pialIr') Plan Box# t L Job Name k. V172-Rob � APP# 14 3 C1 Valuation 17 tRoZ SQ Feet / W00 Garage '10 2- = = 2262 Inspections for SFD/SFA Crawl_ Slab__ Mono L.--- gasement_ Footing Footing Plum Under Slab Footing Foundation Foundation Ele. Under Slab Foundation Address Address Address Waterproofing Open Floor Slab Mono Slab Plum Under slab Rough In Rough In Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation Final Foundation Survey Envir. Health✓ Other Additions/Other Footing Foundation_ Slab_ Mono_ Open Floor Rough In Insulation_ Final