PLAN REVIEW SHEET Date Cil—X-1, 7
Plan Box itpCZ Job Name Vold d b1CC ,
l0-!
App a 1-109—LS Valuatiorf3 010g (o SQ Feet 31 3
Garage `4-s-4
= 3592-
Inspections
f
SFD/SFA
Crawl V Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab . Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final 1Foundation Survey( I,S Envir. Health N M Other
t1 C"
Additions / Other
Footing_
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_