PLAN REVIEW SHEET -- -, II Date U) (44I I r]
Plan Box# 1— `-t Job Name In r1
1
App# 131 c1 Valuations 1 % 172 SQ Feet 3-5g 7
Garage s i 2-
=
= yo & 9
Ins ections for FD SFA
Crawl Slab Mono Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
/// Final
Foundation Survey�/ Envir. Health Other
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final