PLAN REVIEW SHEET L J Date (o 1
Plan Box # Job Name/AArvY�IdQfQYSOYI CPU(tCVDS11/1G #$
App if I7-SIS'+lS39 Valuatij Q.35 3g L SQ Feet Ati SL
Garage LI
= ZS' 27
Inspections for SFD/SFA /
Crawl_ Slab_ Mono V Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey9/S Envir. HealthSEWII Other
Additions/ Other
Footing_
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final