Loading...
PLAN REVIEW SHEET B\ Date Si a S � Plan Box it 1qq Job Name bts-n�/ (�\p i ANan App# y\'Si S valuation*2l(o,(qc2- SQ Feet )2cc7 Garage '177 a7,3/ Inspections for SFD/SFA Crawl ‘/ Slab_ Mono_ Basement_ Footing Footing Plum Under Slab Footing Foundation Foundation Ele. Under Slab Foundation Address Address Address Waterproofing Open Floor Slab Mono Slab Plum Under slab Rough In Rough In Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation / Final Foundation Survey_ Envir. Health Vi"." Other Additions/Other Footing Foundation_ Slab_ Mono_ Open Floor_ Rough In Insulation_ Final_