PLAN REVIEW SHEET Date 5-
Plan Box# ( 5 Job Name SSpu'wU
App # Ils-6091L/5)-- valuation 1 Z - yiz- SQ Feet �367
Garage q7 0
17 ? 7
Inspections for SFD/SFA
Crawl Slab_ Mono_ Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation He. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab • Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final
Open Floor
Rough In
Insulation
r Final
Foundation Survey�U Envir. HealtIF Other
S_Qp1'lr,
Additions/ Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final