Loading...
PLAN REVIEW SHEET Date 1.41--tii.r2 Plan Box# E 7 Job Naml {C . Oct App # 04-5-I-1Valuation 2a`3�72a SQ Feet 3oz Garage -s—s—9 =5579 • Inspections fororSED/SFA Crawl ✓ Slab_ Mono_ Basement_ Footing Footing Plum Under Slab Footing Foundation Foundation He. Under Slab Foundation Address Address Address Waterproofing Open Floor Slab Mono Slab Plum Under slab Rough In Rough In Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In Insulation / Final Foundation Survey✓ Envir. Health V Other Additions/Other Footing Foundation_ Slab_ Mono_ Open Floor_ Rough In Insulation_ Final_