PLAN REVIEW RSHEET (� Date 6 nI 1
Plan Box# 135 lob Name 9. i UV' j
APP# U 408 Valuation. `1ST'10`1 Heated SQ Feet 3e3 ?`�
Garage 4rigt
Inspections for SFD/SFA \ /I
Crawl Slab V Mono_ Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address - Waterproofing
Open Floor Slab Mono Slab FlumUnder slab
Roigir In Rough In Rough In Address
Mutation Insulation - Insulation - Slab
Final Final Final - Open Floor
Rough In -Insulation
• Final
Foundation Survey= Envir. Health_ Other.
Additions/Other
Fooling
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation
Final