PLAN REVIEW SHEET `+ (�� Date 5Y) i E I-1Jt U
Wan Box s Job Name IC 1t5 ail)f.3
APP a7 C6 EI Vah atlorr. a 4(0a Heated SQ Feet a F 5
Geese Z
inspection forSFD/SFA
Crawl Slab Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab - .Phim Under slab
Rosgh In Rough In Rough In Address
Insslatlon Insulation Insulation Slab
Final Final - Final Open Floor
Rough In
Insulation
/ • Final
Foundation Survey M Envir.Health f F IA) Other
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor
Rough In
Insulation
Final