Loading...
BUILDING Plan Box Number ZIP_ Job Name/11_5E4 Date: 1,2 ' //) Required Inspections for SFA/SFD Appl. # /0 Valuation >. Sequence Sq. Feet LIFO 10 R* Bldg. Footing 10 -30 R• Elec. Temp Service Pole 20 R* Building Foundation 20 Address Confirmation 30 -999 Open Floor 30 -999 R' Bldg. Slab Insp. 30 -999. R* Elec. Under Slab 30 -999 R *Plumb. Under Slab 40 Four Trade Rough In 40 Four Trade Rough In> 2500 ° Three Trade Rough In Three Trade Rough In> 2500 40 Two Trade Rough In , 40 Two Trade Rough In> 2500 4 0 One Trade Rough In One Trade Rough In > 2500 50 R* Insulation 60 Four Trade Final 60 Four Trade Final > 2500 60 Three Trade Final 60 Three Trade Final > 2500 60 r/ Two Trade Final 60 Two Trade Final > 2500 60 One Trade Final 60 One Trade Final > 2500 999 Envir. Operations Permit