PLAN REVIEW SHEET Date SIS 1 /7
Plan Box ft f"-_S Job Name VC)y nn
App a 4 1 D l Valuation lgt 7kV SQ Feet r904
Garage 533
2
Inspections for SFD/SFA
Crawl_ Slab_ Mono ✓ Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
Insulation
Final
Foundation Survey � Envir. Health ✓/ Other
•
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_