PLAN REVIEW SHEET (( Date I I
Wan Box# / aa Job Name 1� f . N,��(�� ( I e
App# L} , 7`/7 valuation X5-7!g"y Heated SQ Feet G 7c1
Garage y 7 Fr
2 1 57
Inspections for SFD/SFA
Crawl Slab_ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation. El e. Under Slab Foundation
Adlress Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rooth In Rough In Rough In Address
Insolation Insulation Insulation Slab
Final Final - Final Open Floor.
Rough In
insulation
Final
Foundation Survey_ Envir.Health nP 1,t/ Other_
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_