PLAN REVIEW SHEET ��1 Date 4 n
Plan Box # Job Name
App # LA \.\a ‘ Valuation 1/{ 92G -$1 SQ Feet 2 S Z 81
Garage 7 S 3
_
Inspections for SFD/SFA
Crawl_____ Slab L/ Mono_ Basement_
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation
Address Address Address Waterproofing
Open Floor Slab Mono Slab Plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final
Open Floor
Rough In
Insulation
/ Final
Foundation Survey_ Envir. Health✓ Other
Additions/Other N fro
Footing z C 9
Foundation_
Slab_
Mono_
Open Floor_
Rough In
Insulation_
Final_