Loading...
PLAN REVIEW SHEET Q, 2 Date 3 2.„ �� Plan Box'gI 651 Job Name �n (in (�((l� 1 App N 4 (M1 1 ') Valuatirnl732 Heated SQ Feet (,?a$ Garage 4'6-6 1 on for SFD SFA Crawl Slab_ Mono Basement Footing Footing Plum Under Slab Footing Foundation Foundation Ele. Under Slab Foundation. Adiress Address _ Address Waterproofing Open Floor Slab Mono Slab ,plum Under slab Rough In Rough In Rough In Address Insulation Insulation Insulation Slab Final Final Final Open Floor Rough In insulation Final Foundation Survey Envlr.Health fl& (4V Other — 4 Additions/Other Footing Foundation_ Slab_ Mono_ Open Floor Rough In Insulation_ Final_