PLAN REVIEW SHEET Q, 2 Date 3 2.„ ��
Plan Box'gI 651 Job Name �n (in (�((l� 1
App N 4 (M1 1 ') Valuatirnl732 Heated SQ Feet (,?a$
Garage 4'6-6
1 on for SFD SFA
Crawl Slab_ Mono Basement
Footing Footing Plum Under Slab Footing
Foundation Foundation Ele. Under Slab Foundation.
Adiress Address _ Address Waterproofing
Open Floor Slab Mono Slab ,plum Under slab
Rough In Rough In Rough In Address
Insulation Insulation Insulation Slab
Final Final Final Open Floor
Rough In
insulation
Final
Foundation Survey Envlr.Health fl& (4V Other —
4
Additions/Other
Footing
Foundation_
Slab_
Mono_
Open Floor
Rough In
Insulation_
Final_