BUILDING Plan Box Number CO Job Name
Date: 7- `;'- / c�
Required Inspections for SFA/SFD
App1.# - -S662 i2
Valuatio / 5 b 0 8"
Sq. Feet 2 3 SC
Sequence
10 R* Bldg. Footing
10 -30 R* Elec. Temp Service Pole
20 / R* Building Foundation
20 Address Confirmation
30 -999 Open Floor
30 -999 ,,--- R* Bldg. Slab Insp.
30 -999 R* Elec. Under Slab
30 -999 v R *Plumb. Under Slab
40 r/ Four Trade Rough In
40 Four Trade Rough In> 2500
40 Three Trade Rough In
40 Three Trade Rough In> 2500
40 Two Trade Rough In
40 Two Trade Rough In> 2500
40 One Trade Rough In
40 One Trade Rough In > 2500
50 ✓ R* Insulation
60 ,/ Four Trade Final
60 Four Trade Final > 2500
60 ','hree Trade Final
60 Three Trade Final > 2500
60 ['wo Trade Final
60 fwo Trade Final > 2500
60 One Trade Final
60 One Trade Final > 2500
999 Fnvir. Operations Permit