Loading...
INSPECTIONS PREPARED 3/3Q/10, 13:58:19 INSPECTION TICKET PAGE 57 Harnett County INSPECTOR: IVR DATE 3/31/10 ADDRESS . : US HWY 301 SUBDIV: CONTRACTOR : STRICKLAND JEREMY MATT PHONE : (910) 890 -2160 OWNER . : MCLAMB CARLIE C & JOYCE S PHONE : (910) 892 -4124 PARCEL . . : 02 -1528- - -0025- - - APPL NUMBER: 10- 50024080 CP NEW STORAGE BLDG RESIDENTIAL DIRECTIONS : T /S: 03/29/2010 03:53 PM VBROWN - - -- 51 NEIGHBORS ROAD DUNN 28334. 421 TOWARDS DUNN, LEFT ON 301N TOWARDS BENSON GO APPROX 6MI, LEFT ON NEIGHBORS RD, SITE ON LEFT @ 51 NEIGHBORS ROAD. T /S: 03/30/2010 11:14 AM VBROWN NO EH SINCE NO SFD ON PROPERTY. NO PLAN REVIEW SINCE BUILD ALREADY BUILT. LAND NOTES : BPMN 2/03/10 20210 MS MCLAMB SAID THAT THEY HAVE A 40X60 STORAGE BUILDING ON THIS PROPERTY. STRUCTURE BUILT WITHOUT PERMITS. THEY NOW WANT ELECTRICAL PERMIT FOR BUILDING, BUT THEY HAVE TO BUY BUILDING, LAND USE AND GO THRU INSPECTIONS TO GET ELECTRICAL. SHE SAID THEY WERE FARM EXEMPT BUT THEY ARE NOT. THEY ARE NOT TAX DEFERRED. SUPPOSEDLY THE BUILDING IS ON THIS TRACT BUT POSSIBLY TRACT WITH HOME. STRUCTURE: 000 000 40X60 STORAGE BUILDING FLOOD ZONE • FLOOD ZONE X PROPOSED USE 40X60 STRBLD SEPTIC - EXISTING' • NONE WATER SUPPLY • NONE PERMIT: CPBP 00 CP BUILDING PERMIT REQUESTED INSP DESCRIPTION TYP /SQ COMPLETED RESULT RESULTS /COMMENTS R229 01 3/31/10 TI ! TWO TRADE FINAL TIME: 17:00 VRU #: 001902246 T /S: 03/29/2010 04:16 PM NTART COMMENTS AND NOTES jY � ai ( • MASSENGILL ASSOCIATES, P. A. CONSULTING ENGINEERING DESIGN AND PROJECT MANAGEMENT 118 E. MAIN STREET, P. O. BOX 895, BENSON, N. C. 27504 - 0895 PHONE: 919-894-2071 FAX 919 - 894-7288 MARCH 1, 2010 STRICKLAND BUILDING COMPANY, INC 2859 HOBSON ROAD DUNN, N. C. 28334 SUBJECT: METAL STORAGE BUILDING FOUNDATIONS LOCATED AT 57 NEIGHBOR'S ROAD DUNN, N. C. DEAR MR. STRICKLAND: ON MARCH 1, 2010, I VISITED THE BUILDING TO EXAMINE THE BUILDING SLAB AND FOUNDATION. 1. I PROBED THE PERIMETER CONCRETE SLAB AND FOUND THE FOOTING DEPTH AND LOCATION TO BE IN COMPLIANCE WITH THE FOUNDATION DESIGN PLANS. THE UNDERLYING SOILS WERE PROBED AND FOUND TO BE ADEQUATE FOR THE FOUNDATION LOADING OF THIS STRUCTURE. 2. THE SLAB WAS SCANNED TO VERIFY THE LOCATION OF THE FOUNDATION STEEL REINFORCEMENT. SUMMARY: THE FOUNDATIONS WERE INSTALLED IN ACCORDANCE WITH THE DESIGN PLANS. IF YOU HAVE ANY QUESTION, PLEASE GIVE US A CALL. MAS NGI L ASSOC A ., PnAns-»„. c� w 03 9) . 3 ` t 1 W.MASSENGI ,P. SEAL • 8430