Loading...
BUILDING Plan Box Number RA 1 3 Job Name,,,,, Date: to _7- I 6 Required Inspections for SFAiSFD Appl. # ) ((, -5Ot 2`O 3 Z Valuationif 117 H 6 3 Sequence Sq. Feet 1 W6 - 7 10 R* Bldg. Footing 10 -30 R* Elec. Temp Service Pole 20 ✓ R* Building Foundation 20 Address Confirmation 30 -999 , ‘Z Open Floor 30 -999 R* Bldg. Slab Insp. 30 -999 R* Elec. Under Slab 30 -999 R *Plumb. Under Slab 40 Four Trade Rough In 40 Four Trade Rough In> 2500 40 Three Trade Rough In 40 Three Trade Rough In> 2500 40 Two Trade Rough In 40 Two Trade Rough In> 2500 40 One Trade Rough In 40 One Trade Rough In > 2500 50 ✓ R* Insulation 60 Four Trade Final 60 Four Trade Final > 2500 60 "three Trade Final 60 three Trade Final > 2500 60 Two Trade Final 60 Two Trade Final > 2500 60 One Trade Final 60 One Trade Final > 2500 999 Lnvir. Operations Permit