Loading...
BUILDING J c Plan Box Number & 7 Job Name___C Date: 6 R- I O Required Inspections for SF /VS FD Appl. # 1 6 -Ma 2yss j Valuation 2 3c3 Siq Sq. Feet 3 s y g Sequence 10 ✓ R* Bldg. Footing 10 -30 R* Elec. Temp Service Pole 20 ✓ R* Building Foundation 20 Address Confirmation 30 -999 ✓ Open Floor 30 -999 R* Bldg. Slab Insp. 30 -999 R* Elec. Under Slab 30 -999 R *Plumb. Under Slab 40 Four Trade Rough In 40 f Four Trade Rough In> 2500 40 Three Trade Rough In 40 Three Trade Rough In> 2500 40 Two Trade Rough In 40 Two Trade Rough In> 2500 40 One Trade Rough In 40 One Trade Rough In > 2500 50 ✓ R* Insulation 60 Four Trade Final 60 / Four Trade Final > 2500 60 Chree Trade Final 60 Three Trade Final > 2500 60 Two Trade Final 60 Two Trade Final > 2500 60 One Trade Final 60 One Trade Final > 2500 999 Envir. Operations Permit