BUILDING J
Plan Box Number Co Job Name A LL_ go
Date: - 27 ( 6
Required Inspections for SFA,'SFD
Appl. # 22.7
Valuation 1 K I in C.
Sq. Feet ra„9 `J ci
Sequence
10 R* Bldg. Footing
10 -30 R* Elec. Temp Service Pole
20 ✓ R* Building Foundation
20 Address Confirmation
30 -999 ✓ Open Floor
30 -999 R* Bldg. Slab Insp.
30 -999 R* Elec. Under Slab
30 -999 R *Plumb. Under Slab
40 ✓ Four Trade Rough In
40 Four Trade Rough In> 2500
40 Three Trade Rough In
40 Three Trade Rough In> 2500
40 Two Trade Rough In
40 Two Trade Rough In> 2500
40 One Trade Rough In
40 One Trade Rough In > 2500
50 ✓ ft* Insulation
60 ✓ Four Trade Final
60 Four Trade Final > 2500
60 Three Trade Final
60 three Trade Final > 2500
60 Iwo Trade Final
60 Two Trade Final > 2500
60 ' )ne Trade Final
60 )ne Trade Final > 2500
999 !:nvir. Operations Permit