Loading...
BUILDING 3 Plan Box Number s Job Name Fano. Pt Date: 3-I6' Required Inspections for SFA/SFD Appl. # 16 -SO b23 R O Valuation */ 27 Z14 Sq. Feet / "Sr Sequence 10 ✓ R* Bldg. Footing Pig( 10 -30 R* Elec. Temp Service Pole 20 / R* Building Foundation 20 Address Confirmation 30 -999 Open Floor 30 -999 R* Bldg. Slab Insp. 30 -999 R* Elec. Under Slab 30 -999 ✓ R *Plumb. Under Slab 40 Four Trade Rough In 40 Four Trade Rough In> 2500 40 Three Trade Rough In 40 Three Trade Rough In> 2500 40 Two Trade Rough In 40 Two Trade Rough In> 2500 40 One Trade Rough In 40 One Trade Rough In > 2500 50 ✓ R* Insulation 60 / Four Trade Final 60 Four Trade Final > 2500 60 Three Trade Final 60 Three Trade Final > 2500 60 Two Trade Final 60 Two Trade Final > 2500 60 One Trade Final 60 One Trade Final > 2500 999 Envir. Operations Permit