BUILDING 3
Plan Box Number s Job Name Fano. Pt
Date: 3-I6'
Required Inspections for SFA/SFD
Appl. # 16 -SO b23 R O
Valuation */ 27 Z14
Sq. Feet / "Sr
Sequence
10 ✓ R* Bldg. Footing
Pig(
10 -30 R* Elec. Temp Service Pole
20 / R* Building Foundation
20 Address Confirmation
30 -999 Open Floor
30 -999 R* Bldg. Slab Insp.
30 -999 R* Elec. Under Slab
30 -999 ✓ R *Plumb. Under Slab
40 Four Trade Rough In
40 Four Trade Rough In> 2500
40 Three Trade Rough In
40 Three Trade Rough In> 2500
40 Two Trade Rough In
40 Two Trade Rough In> 2500
40 One Trade Rough In
40 One Trade Rough In > 2500
50 ✓ R* Insulation
60 / Four Trade Final
60 Four Trade Final > 2500
60 Three Trade Final
60 Three Trade Final > 2500
60 Two Trade Final
60 Two Trade Final > 2500
60 One Trade Final
60 One Trade Final > 2500
999 Envir. Operations Permit