Loading...
IPAC R w/ attachmentHTE# 07-s= 2aI-161k Harnett County Department of Public Health 2 5 61 2 hDrovement Permit A building permit cannot be issued with only an Improvement Permit ISSUED T0 W V / PROPERTY LOCAT( N: JX /j0 a L, 'A - p, 1` M : ct a z4 C ~ A ct n cs~CK r SUBDIVISION k ..v- C c«w LOT # 3 NEW REPAIR EXPANSION ❑ Site Improvements required prior to Construction Authorization Issuance: Type of Structure: M 7o, Proposed Wastewater System T e: e 11 r e W Projected Daily Flow: GPD Number of bedrooms: 3 Number of Occupants: max Basement ❑Yes NCI o Pump Required: ❑Yes ❑ No D?"May be required based on final location and elevations of facilities Type of Water Supply: ❑ Community ❑ Public ❑ Well Distance from well feet Permit valid for. ?_'Five years Permit conditions: ❑ No expiration Authorized State Agent:: 0_ w Date: 2 n 0~ SEE ATTACHED SITE SKETCH The issuance of this permit b ealth Department in no way guarani es the issuance of other permits. The permit holder is responsible for checking with appropriate governing bodies in meeting their requirements. This site is subject to revocation 0 the site plan, plat, or the intended use changes. The Improvement Permit shall not be affected by a change in ownership of the site. This permit is subject to compliance with the provisions of the Laws and Rules for Sewage Treatment and Disposal and to conditions of this permit. Construction Authorization (Required for Building Permit) The construction and installation requirements of Rules .1950, .1952, .1954, .195S, .1956, .1951, .1958, and .1959 are incorporated by references into this permit and shall be met. Systems shall be installed in accordance with the attached system layout. ISSUED TO: Aoa j t - Wfi yo_e. / IVd C KiI~r+ PROPERTY LOCATION: .X 4t. lecl, SUBDIVISION Csrol-e, LOT # Facility Type: A rat New ❑ Expansion ❑ Repair Basement? ❑ Yes 0;,*"NO Base t Fixtures? ❑ /Yes ❑ No Type of Wastewater System" ; d ~trS7~CV"' (Initial) Wastewater Flow: JL b GPD (See note below, if applicable C~ T ~e (Repair) Installation Requirements/Conditions Number of trenches Septic Tank Size 000 gallons Exact length of each trench -7Q feet Trench Spacing: Feet on Center Pump Tank Size 1000 gallons Trenches shall be installed on contour at a Soil Cover. inches t ^e-e `l r d Maximum Trench Depth of: inches (Maximum soil cover shall not exceed (Trench bottoms shall be level to +/-1/4" 36" above the trench bottom) in all directions) Pump Requirements: ft. TDH vs. GPM inches below pipe c- r Aggregate ` inches total . -acs e /o F-J'e_ r74 IL-. /'a .c s %Z; ( pt t 4Z4 ',j 4 e **If applicable: /understand the system type specified is different from the type specified on the app/ration. / accept the specifications of this permit, Owner/Legal Representative Signature: Date: This Construction Authonzaaon is subject to revocation if the site plan, plat, or the intended use changes. The Construction Authorization shall not be transferred when there is a change in ownership of the site. This Construction Authorization is subject to compliance with the provisions of the Laws and Rules for Sewage Treatment and Disonml and m rho rnoditim, of this -4 C6F ATTArurn CITC (YGM Authorized State Agent: f Date: ~o onstruction Authorization Expiration Date: ~S°" 0~ HTE # g- - - r,Zy C t f- Permit # a 5- I 2 Harnett County Department of Public Health Site Sketch PROPERTY LOCATON: SR //OQ L ..,e- XJ ISSUED TO: / Q CL t1sla 11 SUBDIVISION ~ k . •r C"r LOT # ~ Authorized State Agent: Date: Q/V /2 0 0 9 e ~ G ~ ^~Sr ~ mo't' 1~ t 1 c Rcj, u p yD IZI . 4i. Nffl~ Ell, ~a i Zg~ ( / z / -14i U o p C2 / H w ?8 0 D s D ~ cTi V 7 0 / Op .qq i my p0. , ,Q z S ~ ~ X13 ~c0 / g Syr' 4,~ Op f McVUGHLIN - ROAD J , ° AOo 1 ~y ~g aa j m > > ZD~ Q ,a 6 6oE D 2 DD 22 o a w x g a z ti \ dyo ~ J m $ € 9 $ g n SSA F ~ ~ m O DJ 4 RCCDRD MAP N (1) Fill systems may be installed on sites where at least the first 18 inches below the naturally occurring soil surface consists of soil that is SUITABLE or PROVISIONALLY SUITABLE with respect to soil structure and clay mineralogy, and where organic soils, restrictive horizons, saprolite or rock are not encountered. Further, no soil wetness condition shall exist within the first 12 inches below the naturally occurring soil surface and a groundwater lowering system shall not be used to meet this requirement. Fill systems shall not be utilized on designated wetlands unless the proposed use is specifically approved in writing by the designating agency. The following requirements shall also be met: (A) Nitrification trenches shall be installed with at least 24 inches separating the trench bottom and any soil horizon UNSUITABLE as to soil structure, clay mineralogy, organic soil, rock or saprolite. However, if a low pressure pipe system is used, the minimum separation distance shall be 18 inches. (B) Nitrification trenches shall be installed with at least 18 inches separating the trench bottom and any soil wetness condition. This separation requirement for soil wetness conditions may be met with the use of a groundwater lowering system only in Soil Groups I and II, with SUITABLE structure and clay mineralogy. However, if a low pressure pipe system is used, the minimum separation distance shall be 12 inches. (C) Systems shall be installed only on sites with uniform slopes less than 15 percent. Storm water diversions and subsurface interceptor drains or swales may be required upslope of the system to divert surface runoff or lateral flow from passing over or into the system. (D) The long-term acceptance rate shall be based on the most hydraulically limiting soil horizon within 18 inches of the naturally occurring soil surface or to a depth one foot below the trench bottom, whichever is deeper. The lowest long-term acceptance rate for the applicable soil group shall be used for systems installed pursuant to this Rule. However, the long-term acceptance rate shall not exceed 1.0 gallons per day per square foot for gravity distribution or 0.5 gallons per day per square foot for low-pressure pipe systems installed on sites with at least 18 inches of Group I soils below the naturally occurring soil surface or to a depth of one foot below the trench bottom, whichever is deeper. (E) If the fill system uses low-pressure pipe distribution, all the requirements of Paragraph (a) of this Rule, except Paragraph (a)(2)(B), shall apply. Systems with a design daily flow greater than 480 gallons per day shall use low-pressure pipe distribution. (F) Fill material shall have such soil texture to be classified as sand or loamy sand (Soil Group I) up to the top of the nitrification trenches. The final six inches of fill used to cover the system shall have a finer texture (such as Group II, III) for the establishment of a vegetative cover. Existing fill material shall have no more than ten percent by volume of fibrous organics, building rubble, or other debris and shall not have discreet layers containing greater than 35 percent of shell fragments. (G) Where fill material is added, the fill material and the existing soil shall be mixed to a depth of six inches below the interface. Heavy vegetative cover or organic litter shall be removed before the additional fill material is incorporated. (H) The fill system shall be constructed as an elongated berm with the long axis parallel to the ground elevation contours of the slope. (I) The side slope of the fill shall not exceed arise to run ratio of 1:4. However, if the first 18 inches below the naturally occurring soil surface is Group I soil, the side slope of the fill shall not exceed a rise to run ratio of 1:3. (J) The outside edge of the nitrification trench shall be located at least five feet horizontally from the top of the side slope. (K) The fill system shall be shaped to shed surface water and shall be stabilized with a vegetative cover against erosion. (L) The setback requirements shal I be measured from the projected toe of the slope. However, if this setback cannot be met, the setback requirements shall be measured from a point five feet from the nearest edge of the nitrification trench if the following conditions are met: (i) Slope of the site shall not exceed two percent; (ii) The first 18 inches of soil beneath the naturally occurring soil surface shall consist of Group I soils; (iii) The lot or tract of land was recorded on or before December 31, 1989; and 42 r..i-ru /I/Vos k c31 o~ J6'~ 0 D -t C) m '4 . 0 GI) 38'68t, 8,8a a90S I~ 4 ' IA I rs z \ z -A r v z rri ~6. . 8 o :o .00 ~J Cn D Sao :TJ~ ; ; ,90 J w Zc,, 2 y1 y0 `,tea 0 1-4 C Qo h 00 O w~ N ~ ( .ft") p.l Fi u- SYJ~`"` ~ cow u 4.~-~ rr~~►~ L a I o pct Owner; Ad4e-s*; LoC4tion; L,Al -re-p- 01-1--,C1-~ Mauna P4a10QQ VlQt Flab ?5 R I v cl WT Widt4 Pf top LT l"th Qf - top WA r Width of bottgn La = i"th Qf l ottcm SS a Wpp- 7p 1= depth rr 141 41 t QV" clep P•~ I Standard Yroceaures 1! 1. Fill material'shall be applied in two stages, a. Initial ill material shall have such soil texture as to be lassified as sand or loamy sand (soil Group I) tnd shall be applied to a depth of ( lswhich will be level with the top of the n it rif ical ion trenches. See ID on Mound Dimension Section. b. The final 6" of fill used to cover the system shall be placed on the mound after the system is installed, have a finer texture and be classified as sandy loam, loam, silt, silt loam, sandy clay loam, clay loam or silty clay loam (soil Groups II and III) for the establishment of vegetative cover. See CD on Mound Dimension Section. 2. The fill material and the eiisting soil shall be mixed to a depth of 6" below the interface. 3. Heavy vegetative cover or organic litter shall be removed before fill material is incorporated. 4. ( Proceed nitrification field installation { Inspection of mound prior to installing drainfield. 5. Have inspection approval prior to covering and finish grading. ~6. The fill system shall be shaped to shed surface water and shall be stabilized with a vegetative cover against erosion. This shall be accomplished by placing straw and grass seed on the system after landscaping is completed. Remarks/Recommendat ions ~qs 01-- l Name , ! = 1.4--Q- P ~ r Date. 2`+ /1111 Telephone , £1110 S Ll ' CY i p.4