BUILDING
Plan Box Number 12
Job Name
Date: C
Required inspections for SFA/SFD
Appi.# Og-Y6 o22
Valuation I-a
Sequence Sq. Fed 75
Z
10
10.30 Re Bldg. Footing
20 R• Elec. Temp Service Pole
20 / R° Building Foundation
30-999 Address Confirmation
Open Floor
30-999 R' Bldg, Slab Insp,
- R• Elm Undue stab
40 FoROPhAn& y Trade UnRough der l
to
j 11) Four Trade
Rough Irv 2500
- - - :c Trade Rough is
40 . 1, 0 Three Trade Rough In> 2500
Two Trade Rough [a
In zsoo
0 One Trade 50 R~°~Rough In > 2500
Four Trade Find
60 0 Four Trade Final > 2500
Three Trade Final
60 Three Trade Final > 2500
Two Trade Final
Two Trade Final > 2500
60 One Trade Final
qqq-- One Trade Final > 2500
Envir. Operations pmt