Loading...
Email- Steps after prelim approval Page 1 of 2 From: Samantha Ficzko Sent: Wednesday, September 06, 2006 11:00 AM To: 'Don Wiggins' Subject: RE: Update on Tonight Don,   Good morning.   First, let me apologize for not getting back to you yesterday. I was sure I had sent a reply but I got to thinking about it this morning and realized I didn’t!   Since Walnut Grove was approved, your next step will be to get all the infrastructure installed and get us a final plat. Many of our developers/surveyors choose to wait to turn in the final plats until they have completed all the necessary infrastructure so that it will pass inspection and the final can be approved. If you want to (possibly) save some paper, you can email us a PDF of the final plat before you bring in the mylars. We will review the PDF the same as we would if you brought in a physical copy but it will prevent you from having to do reprints if there are corrections.   I don’t see any reason that clarifying the soils information on the final would be a problem. The more information we have, the better!   I have sent a letter and copy of the preliminary signed by the planning board chair today so you should be getting that in the next few days.   Let me know if you need anything else and have a great (rainy) day!   ~Samantha     Thanks and have a great day!   Samantha Ficzko Planner I Harnett County PO Box 65 108 E. Front St. Lillington, NC 27546 (910)893-7525 Fax(910)814-6459 -----Original Message----- From: Don Wiggins [mailto:dwiggins@gfba.net] Sent: Tuesday, September 05, 2006 12:41 PM To: Samantha Ficzko Subject: Update on Tonight   I trust all is well in Harnett County and I am contacting you to determine if all is still well for tonight's Board meeting on Walnut Grove Subdivision?   Once that is approved (being optimistic), what is the next step for the Preliminary Subdivision process?     Do the submitted documents become the record documents of this Prelim. Sub'n Permit or do we need to submit Mylars or something like that which get them Stamped as approved before they are filed away?   Our boss was hoping to further elaborate (reword or re-clarify) the "Soils Survey/Determination Note" on sheet L-2 of the Drawing set if possible, and that is why I am asking about the remaining procedures(s) file://C:\Documents and Settings\subdivision\Local Settings\Temp\ELF2B5\Email-Steps af...3/23/2009 Page 2 of 2 left for the Prelim. Subdivision process.   His desired rewording doesn't change anything shown on the plans, it just "More-Better" details who determined the soils delineation shown on the Plans, and the intent is for our Office CYA/Liability purposes.     Is a slight re-wording like we would like to occur, acceptable after tonight's Board Meeting, or does the current wording have to remain as it currently exists?   Forgive me if this is making things difficult, but I am trying to follow-thru to determine what can or can not be done in this matter.   I will look forward to your response.   Have a great nite, and hope you don't have to stay too long at tonight's Board Meeting.   Don   Don Wiggins George Finch/Boney & Assoc., PA (w) 919/833-1212 (f) 919/834-3203   file://C:\Documents and Settings\subdivision\Local Settings\Temp\ELF2B5\Email-Steps af...3/23/2009