Loading...
3rd Party Final Inspection Report for Structural SteelKAM Geotechnical Engineering Services Construction Material Testing Civil Quality Control Engmeenng Services, EC. October 31,2012 Harnett Health System 800 Tilgman Drive Dunn,NC 28335 Attention: Mike Jones and Mr. Chas Fare RE: Special Inspections Final Report - Structural Steel Harnett Health Complex Lillington, North Carolina KAM Project Number 11-0114 Gentlemen: KAM Engineering Services, P.C. has completed the materials testing services for the above stated project. This Special Inspections Final Report is intended to confirm that KAM Engineering was present periodically during the erection of structural steel at this project. A series of nineteen (19) periodic inspections were performed by our staff to provide the structural steel inspections. Our testing was performed by a single Certified Weld Inspector (CWI) to provide continuity throughout our inspection process. At the time of testing and observations, the bolted and welded connections were acceptable. When deficiencies were noted, they were corrected for re-inspection on a subsequent visit. According to our reporting, there are no outstanding noted deficiencies present at this project. To our knowledge, the structural steel connections (welded, bolted and screwed) were in general accordance with the approved project plans, specifications and shop drawings, and applicable workmanship of the International Building Code. Respectfully submitted, %»»«""""i»/ KAM Engineering Service8lK& C-4/?x^'V.ce. Senior Geotechnical Engiri%$c ^ 610 Spring Branch Road Dunn, NC 28334 Phone(910)292-2085 Fax(910)292-2087 www.KAM-Engineering.com